Technical Details
System InstalledGarland Built up RBM felt warm roof system.
ComplianceInstalled to NHBC, BS 6229 / BS 5534, Safe2Torch, and manufacturer specifications.
Warranty25 year Garland single point guarantee.
Build-Up / Specification
- Primer: Garla Prime and SA Contact Primer.
- Vapour control layer :Torch Flex and SA flex Vapour barrier.
- Insulation: Tailor made Cut to fall PIR insulation scheme.
- Underlay:Torch flex ultra vent, Torch evolution base sheet and dual release SA base sheet.
- Capsheet: Stress ply flex.
Challenges & Solutions
Examples:
- Worked around bad weather
- Had to retrofit and make good previous bad workmanship at some of the roof junctions and details which interface with adjacent areas
- Restricted access requiring scaffold due to the height being around 15m
- Had to use a mechanical hoist for getting materials up and rubbish down due to the Height challenge
- The location of the roof in relation to the school layout meant that it was a very large walk between where vans were parked and materials, welfare and skips were stored and the roof area we were working on.
Outcome / Results
Examples:
- Delivered on time and within programme.
- Fully warranted system signed off by manufacturer
- Improved thermal performance and drainage.
- Client satisfaction / positive feedback.